Our 20+ years of experience and detailed-oriented approach means greater results for our clients. Below you’ll find some of our past projects.
General Contracting – Design and Build
Time to complete: 3 weeks
Cooperation:
- RoboPro Renovations
Scope of work:
- Design and planning
- Budget management
- Team and Trade Partners management
- Quality control
- Risk management
- Scheduling
- Construction management
Building Envelope Renovation
One more successful collaboration with Denis Bruneau Architecture. Interior and exterior renovation of the Bell Tower at Westminster Abbey in Mission.
Time to complete: 5 Months
Cooperation:
- Denise Bruneau Architecture
- RoboPro Renovations
- Suspended Stages
Scope of work:
- New louvres – design, build and install.
- Spot concrete repairs.
- Concrete sealer application
- Architectural sheet metal
Multifamily Apartment on Main St.
Project: New Construction
Time to complete: 5 months
Cooperation:
- Klassen Building Supplies Ltd
- Euro Stucco
Scope of work:
- Weather barrier
- Fiber cement architectural panels
- Architectural sheet metal panels
- Stucco cladding
- Rain screen
- Backer bord installation for brick veneer cladding
High Performance House
Project: New Construction
CLAY Construction was looking for a reliable and Passive House qualified Building Envelope contractor for a new construction project in Burnaby.
Time to complete: 8 Months
Scope of work:
- 2” Semirigid Exterior Insulation Installation
- Rain Screen Installation over 2” Exterior Semirigid Insulation ensuring no damage to air and weather control membrane.
- Wall penetration detailing ensuring weather and air tightest.
- Custom on-site made light, power outlet and hose bib metal plates and boxes.
- Custom metal window and door trim, design and installation reducing thermal bridging and providing sufficient ventilation behind cladding.
- Flashings installation ensuring no thermal bridging and sufficient ventilation behind cladding.
- Architectural Metal Panels, production and installation.
- Metal Fascia and Cap Flashings.
- Hemlock soffit, supply and installation ensuring attic ventilation.
- SAGIWALL , Fire Rated High Performance Polymer Siding.
- Shou Sugi Ban, Burnt Cedar Siding.
- Standing Seam Metal Roof.
Passive House
Project: Retrofit
CLAY Construction was looking for a reliable and Passive House qualified Building Envelope contractor for a retrofit project in Vancouver.
Time to complete: 10 months
Scope of work:
- Rain Screen Installation over 6” Exterior Semirigid Insulation ensuring no damage to air and weather control membrane.
- Wall penetration detailing ensuring weather and air tightness.
- Custom on-site made light, power outlet and hose bib metal fixtures.
- Custom metal window and door trim design and installation ensuring minimal thermal bridging and sufficient ventilation behind cladding.
- Flashings installation ensuring no thermal bridging and sufficient ventilation behind cladding.
- Architectural Sheet Metal Post and Beam design and installation.
- Metal Wood Grain soffit installation ensuring attic ventilation.
- Hardie Lap Siding installation.
Westminster Abbey Church Exterior Renovation
Project: Institutional Renovation
One of the proudest moments in ATRIA work history. Exterior renovation at Westminster Abbey Church in Mission.
Time to complete: 5 Months
Cooperation:
- Denis Bruneau Architecture
- RoboPro Renovations
- EURO Stucco
- Skookum Scaffolding
Scope of work:
- Spot concrete repairs
- Power washing
- New TPO Roofing Membrane installation at church buttresses
- New architectural sheet metal work
- Concrete sealer application
Exterior Repairs and Painting
Project: Multifamily Building, Vancouver
Our long-time loyal costumer Terra Housing hired us again to do preventive maintenance work at their multifamily building in Vancouver
Time to complete: 6 Weeks
Scope of work:
- Spot fascia board replacement
- Power washing
- Painting
- Caulking
- Gutter cleaning
- Courtyard drain maintenance
Cedar Siding and Soffit
Project: Addition in Madeira Park, Sunshine Coast, BC
My estimator’s friend Mike was looking for cladding contractor to install cedar cladding at his addition in Madeira Park. Adrian recommended my company. 5 days later we were on the ferry to the beautiful Sunshine Coast.
Time to complete: 2.5 weeks
Scope of work:
- Cedar roof fascia
- Cedar soffit
- Rain screen system for vertical wood siding installation
- Vertical Cedar Tong and Grove siding installation
- Down pipes installation
Long Board and Easy Trim
Project: New Construction in Burnaby, BC
We were working in Atwal’s neighborhood during the construction of his new home. He liked our work and hired Atria to do a building envelope at his new residence.
Time to complete: 4 Weeks
Scope of work:
- Building Paper
- Rain Screen
- Aluminium Long Board
- Easy Trim Fibre Cement Panels
- Cedar Soffit
Building Envelope
Project: Multifamily New Construction in Merritt, BC
Our repeated customer and developer Irfan was building a 75 units apartment building in Merritt. It was not easy and sometimes cold, but we got it done.
Time to complete: 6 months
Scope of work:
- Building paper
- Split insulation wall assembly
- Reveal 2.0 Panel Cladding
- Metal Cladding
- Lap Fibre Cement Siding
- Soffits and flashings
Multifamily Mixed Use
Project: Multifamily, mixed use, new construction.
Project manager Dave form Thind Properties was looking for a cladding contractor to do a building envelope at his new construction project in Vancouver.
Time to complete: 4 Months
Scope of work:
- New building paper
- Window prep work
- New rain screen
- New fibre cement lap siding installation
- New fibre cement panel installation
- New fibre cement soffit installation
- Cap flashings and sheet metal architectural work
Building Envelope Renovation
Project: Single Family Home in North Vancouver
Friend and builder Gord from GMW Dream Build, called me for help with cladding installation at his reno project in North Vancouver.
Time to complete: 4 weeks
Scope of work:
- New building paper
- New rain screen
- New fibre cement lap siding
- New cedar soffit and siding
Full Building Envelope Renovation
Project: Single family home in Mission, BC
Mike from Mission, just moved in to his new home. He found my website and called me to do full exterior reno of his new purchased home.
Time to complete: 5 Weeks
Scope of work:
- Demolition of existing vinyl siding
- Demolition of existing deck and stairs
- New Vinyl Siding installation
- New Stone Venire installation
- New Vinyl deck installation
- New stairs
- New metal roof construction and installation over the garage door and side door
Heritage Restoration
Project: Vintage Suites in Vancouver, BC
One of my first costumers and now friends, John and his family are owners of four heritage buildings in Vancouver. I was recommended by my friend and business partner at Remont Construction Ltd, Robert.
Time to complete: On going
Scope of work:
- Stairs restoration
- Deck restoration
- Fascia and cladding repairs and replacement
- Fence repairs
- General maintenance
Leaky Wall Repair
Project: Coach House in Vancouver, BC
My friend and contractor, Chris asked me for help with a leaky wall at one of his projects in Vancouver.
Time to complete: 3 Weeks
Scope of work:
- Existing stucco demolition
- Water damaged sheeting repair
- New building paper
- New blue skin at wall penetrations and canopy attachment
- New rain screen
- New stucco matching existing
Light Commercial Project
Project: Daycare building in Coquitlam
My friend and construction contractor Stan asked me to do cladding installation at his 4000 sqft, new daycare building in Coquitlam
Time to complete: 4 Weeks
Scope of work:
- New building paper
- New rain screen
- New fibre cement lap siding
- New aluminium soffit
Metal Cladding and Easy Trim
Project: New Construction in Vancouver, completed in cooperation with Remont Construction Ltd.
Project manager Steve was looking for cladding contractor for two separate multifamily projects in Vancouver. We completed them both on time and on budget.
Time to complete: 3 Months
Scope of work:
- New Building Paper
- Rain Screen
- Easy Trim Fibre Cement Panels
- Metal Cladding
- Fibre Cement Soffits
- Cap Flashings
Easy Trim and Cedar Soffit
Project: Multifamily New Construction in Burnaby
Project Manager Steve hired us again after successful completing of smaller project in Vancouver. Done in cooperation with Remont Construction LTD.
Time to complete: 3 Months
Scope of work:
- Building paper
- Rain Screen
- East Trim Fibre Cement Panels
- Cedar Soffit
- Metal Cap Flashings
- Fibre Crown
Cladding Installation
Project: Multifamily New Construction in Maple Ridge, BC.
Masonry contractor Tony recommended my company to the project manager and developer Irfan at Tender Bid Supply. He hired Atria to do building envelope at his new multifamily construction project in Maple Ridge.
Time to complete: 4 Months
Scope of work:
- Building paper
- Rain screen
- Flashings
- Fibre cement lap siding
- Fibre cement shingles
- Aluminium soffit
Post and Beam Barn
Project: New construction in Williams Lake, BC
My long-time friend Adam asked me to help design and build him a new post and beam, open barn. So, we did it in 8 working days.
Time to complete: 2 Weeks
Scope of work:
- Design and drawings
- Framing
- Metal roof
- Cedar siding
Reclaimed Wood Cladding
Project: Single family home in Maple Ridge, BC.
My boss, Magda asked me to design and build a small but functional and attractive foyer.
Time to complete: 2 Weeks
Scope of work:
- Design and drawings
- New foundation and footings
- Framing
- Window and door installation
- New roof and gutters
- Reclaimed wood cladding
- Painting
- New landing wrapped around the addition
Want to know more?
Read more about our services and discover why Atria is the right choice for your next construction project.